Search results  39  in 532,8 ms
           
No Download/Name Doctype Lang Format Size
1 Aureus School, Didcot, Oxfordshire Case Studies English pdf 0,32 MB
Aureus School, Didcot, Oxfordshire

Short description

Sika-Trocal supplied the flexible, high-performance roof system for a spectacular new secondary school building designed to nurture ‘hearts and minds’ of its student intake.

The £19 million Aureus School is a 1,200-capactiy secondary school for students in Didcot, Oxfordshire. The state-of-the-art facility includes a dance studio where yoga and mindfulness classes will be held to improve ‘holistic aspects’ of children’s education.

Date: 8/7/18
Aureus School, Didcot.pdf
Download pdf

2 Bath University Case Studies English pdf 0,17 MB
Bath University

Short description

Case Study of Sika-Trocal Roofing work at Bath University.

Date: 3/4/15
Bath University.pdf
Download pdf

3 Blackwall Tunnel Case Studies English pdf 0,24 MB
Blackwall Tunnel

Short description

Case Study on Sika-Trocals work on Blackwall Tunnel in London.

Date: 3/4/15
Trocal Blackwall Tunnel.pdf
Download pdf

4 Blue Roof, Inchinnan, Renfrewshire Case Studies English pdf 0,28 MB
Blue Roof, Inchinnan, Renfrewshire

Short description

Sika-Trocal Sika S-Vap 5000E SA and Sika-Trocal SGK

A completely flat roof with no falls, the blue roof allows the water to be collected to a certain height and then drains off in a controlled manner with a special outlet controlling the flow into the drainage system.

Date: 3/20/15
Blue Roof.pdf
Download pdf

5 Brentwood Community Hospital Case Studies English pdf 0,40 MB
Brentwood Community Hospital

Short description

Sika-Trocal membrane used at Brentwood Community Hospital.

Date: 3/9/18
Brentwood Case Study.pdf
Download pdf

6 Brighton and Hove Bilingual School Case Studies English pdf 0,35 MB
Brighton and Hove Bilingual School

Short description

Case Study of Sika-Trocal Roofing work at Brighton and Hove Bilingual School

Date: 10/17/17
Biingual School Brighton and Hove.pdf
Download pdf

7 Burton Town Hall Case Studies English pdf 2,09 MB
Burton Town Hall

Short description

With a number of the building’s flat roofs failing to discharge water and with the existing asphalt and felt at the end of their existing lifespan, East Staffordshire Borough Council required a reliable and high performance waterproofing membrane that would also deliver a swift and efficient installation

Date: 4/23/15
Trocal Burton Town Hall.pdf
Download pdf

8 Cambridge Community Church Case Studies English pdf 0,37 MB
Cambridge Community Church

Short description

A case study of Sika-Trocal Roofing work at Cambridge Community Church.

Date: 12/19/17
Cambridge Community Church.pdf
Download pdf

9 Coopers Beach Holiday Park Case Studies English pdf 0,33 MB
Coopers Beach Holiday Park

Short description

Case Study of Sika-Trocal Roofing work at Coopers Holiday Park in Colchester.

Date: 10/23/17
Trocal Coopers Beach Holiday Park.pdf
Download pdf

10 Edinburgh Academy Case Studies English pdf 0,47 MB
Edinburgh Academy

Short description

Sika case study covering the project and product used

Date: 3/9/18
Edinburgh Case Study.pdf
Download pdf

11 Family House, Hammersmith Case Studies English pdf 0,28 MB
Family House, Hammersmith

Short description

Sika-Trocal Sika S-Vap 5000E SA and Sika-Trocal SGK

Date: 3/20/15
Family House Hammersmith.pdf
Download pdf

12 Felixstowe Pier, Suffolk Case Studies English pdf 0,38 MB
Felixstowe Pier, Suffolk

Short description

The flexible, easy-to-install qualities of the Sika-Trocal® SGK system enabled a vital maintenance feature to be incorporated within the roof of a popular
seaside pier without compromise to its aesthetically-pleasing design.

Date: 2/13/18
Felixstowe Pier, Suffolk.pdf
Download pdf

13 Fieldhead Hospital, Wakefield sgl pg.pdf Case Studies English pdf 0,77 MB
Fieldhead Hospital, Wakefield sgl pg.pdf

Date: 2/7/18
Fieldhead Hospital, Wakefield sgl pg.pdf
Download pdf

14 Fossil (UK) Ltd, Milton Keynes Case Studies English pdf 0,23 MB
Fossil (UK) Ltd, Milton Keynes

Short description

Fashion retailer Fossil (UK) Ltd began the refurbishment of its UK headquarters in Milton Keynes following the discovery of corrosion to the powder-coating on the clad parapets. Although the original Sika-Trocal roof remained in perfect functional condition, Fossil opted to have a new Sika-Trocal-S 1.5mm system installed directly on top of the existing membrane.

Date: 11/27/17
Trocal Fossil, Milton Keynes.pdf
Download pdf

15 Kirkliston Primary School, Edinburgh Case Studies English pdf 0,36 MB
Kirkliston Primary School, Edinburgh

Short description

Sika-Trocal’s flexible, easy-to-apply waterproof roofing systemensured the uniform, aesthetically-pleasing delivery of a complex, five-classroom primary school extension in time for the new term.

Date: 12/19/17
Kirkliston Primary School, Edinburgh sgl pg.pdf
Download pdf

16 Lancaster & Morecambe College Case Studies English pdf 0,17 MB
Lancaster & Morecambe College

Short description

Case Study on Sika-Trocal roofing work at Lancaster & Morecambe college.

Date: 3/4/15
Lancaster and Morecambe College.pdf
Download pdf

17 Letham Housing, Letham, Perth Case Studies English pdf 2,06 MB
Letham Housing, Letham, Perth

Short description

Sika-Trocal 1.5 SGK membrane in slate grey C300 used to renew the 3,000 m2 of roofs at Letham Housing, Perth, Scotland.

Date: 12/3/14
Trocal - Letham Perth.pdf
Download pdf

18 Midkent College Case Studies English pdf 0,37 MB
Midkent College

Short description

Sika-Trocal single ply membrane proved its worth on a highly challenging project, using Sika-Trocal S.

Date: 10/23/17
Midkent College Maidstone.pdf
Download pdf

19 Murano Place, Edinburgh Case Studies English pdf 0,34 MB
Murano Place, Edinburgh

Short description

With the new roof set to be overlooked by neighbours, a neat and attractive finsih was a key requirement, making Sika-Trocal S and SGmA the optimum roofing solution.

Date: 11/27/17
Murano Place.pdf
Download pdf

20 Nash Mills Wharf, Hemel Hempstead Case Studies English pdf 0,42 MB
Nash Mills Wharf, Hemel Hempstead

Short description

Residents were able to occupy a set of stylish, sustainable apartments at an exciting waterside housing development ahead of schedule, thanks in
part to the quick and easy installation of Sika-Trocal®’s high-performance waterproofing roof system.

Date: 12/19/17
Nash Mills Wharf, Hemel Hempstead.pdf
Download pdf